Directional drilling by state
Directional Drilling Insurance in South Dakota
What South Dakota law actually does to a fiber bore — strict liability when the locate was good, liability only on proof of negligence when it was not, and eighteen inches doing three separate jobs in one statute.
Most states decide a strike by asking what the excavator did. South Dakota asks first what the operator did — and the answer puts you into one of two liability regimes that are not close to each other.
If the locate came back on time and was good enough, you are strictly liable for all damage your bore proximately causes. If it was late, or wrong, you are not liable at all except on proof of negligence. Nothing about your own care moves you between those two; the marking does. What follows is that binary and the statute around it. The marking decides the liability and SDCL 56-3-18 decides the clause. What the marking is protecting is on the Directional Drilling Insurance pillar and the pollution liability page.
Boring in South Dakota? Whether you are strictly liable or not is decided by someone else’s paint.
Get a Free QuoteThe number that does three jobs
Eighteen inches appears three times in SDCL 49-7A-8, doing something different each time, and a crew that knows only one of them is exposed on the other two.
It is the operator’s accuracy standard. On receipt of notice the operator must advise the excavator of the location of its facilities by marking with stakes, flags, paint or other clearly identifiable markings within eighteen inches horizontally from the exterior sides of the facilities.
It is your clearance duty. Excavators must maintain a minimum horizontal clearance of eighteen inches between a marked facility and the cutting edge of any mechanical equipment.
And it is the hand-dig trigger. Where excavation is required within eighteen inches horizontally, the excavator must expose the facility with hand tools or noninvasive methods approved by rule, and protect and support it before further mechanical excavation.
Read together, those three uses describe a corridor. The operator’s mark is accurate to eighteen inches, so the facility may sit anywhere in a three-foot band; your equipment must stay eighteen inches clear of the mark; and entering that band at all converts the work from mechanical to hand or noninvasive method. Both §49-7A-5 and §49-7A-8 were amended by SL 2026, ch 183, so procedures written against the older text should be re-read.
Forty-eight hours that do not start when you call
Under SDCL 49-7A-5 no excavator may begin any excavation without first notifying the one-call notification center, with notice given at least forty-eight hours before commencement. The section then fixes the start of that clock: the period begins at 12:01 a.m. the day after notice is submitted, excluding any Saturday, Sunday, or legal holiday of the state.
The consequence is that the hour of your call does not matter. A ticket placed at eight in the morning and one placed at five in the evening start counting at the same minute, and a Friday call spends the weekend outside the count. Crews used to states where the clock runs from the call itself routinely lose a day here without noticing.
The operator’s side runs on the same period, but with a wrinkle that runs in your favor if you use it deliberately. Under §49-7A-8 the operator’s response time is the later of the forty-eight-hour period, or the period between notice being given and the excavation start time the excavator provided. Nominating a realistic later start does not shorten the operator’s window — it lengthens it, which is the opposite of the pressure most schedules apply.
Strict liability, or none at all
This is the provision that should shape how a South Dakota file is built.
If the locate was good. Under SDCL 49-7A-10, where the requested information was provided within the time specified and sufficiently identifies the location of the facilities in accordance with §49-7A-8, an excavator damaging or injuring them is strictly liable for all damage proximately caused. There is no fault question. Care, method and experience do not enter into it.
If the locate was not. Under SDCL 49-7A-9, where markings are not provided within the time specified, or where the markings provided fail to identify the location in accordance with statute and rule, an excavator damaging the facilities is not liable except on proof of negligence.
Those two sentences hand the whole question to the marking. Whether you face automatic liability for every dollar or a claimant who must first prove you were careless is decided by whether someone else’s paint arrived on time and landed within eighteen inches.
What follows for practice is unusually clear. The most valuable minutes on a South Dakota job are the ones spent photographing the marks against the clock and against the line as found — because that record is not evidence about your conduct, it is evidence about which statute applies to you. Section 49-7A-10 closes with the necessary caveat: compliance with the chapter does not excuse a person from acting in a careful and prudent manner, and does not disturb civil remedies otherwise available except as the chapter specifically provides.
Disturbed counts, concealment does not
Under SDCL 49-7A-12 the duty triggers on damage that is easy to under-report: if a facility is damaged, dislocated, or disturbed in advance of or during the work, the excavator must immediately notify the center and, if known, the operator. A bore that shifts a line without breaching it is inside that language.
The section then states two prohibitions without qualification. No excavator may conceal or attempt to conceal any damage, dislocation or disturbance. And no excavator may attempt any repair unless authorized by the operator. Where the event releases flammable, toxic or corrosive gas or liquid, the excavator must call 911 and notify the center and the operator.
Section 49-7A-13 adds the reporting duty that runs the other way: an excavator who cannot locate a facility, or who discovers that the operator located it incorrectly, must promptly notify the operator or the center. That is the notification that builds the §49-7A-9 record while the crew is still standing over the hole.
Anyone may complain, and the answer is the record
Under SDCL 49-7A-17 any person with a complaint against a party who violates, or who procures, aids or abets a violation of, §49-7A-2, §49-7A-5, §49-7A-8 or §49-7A-12 may apply to the board for relief — and no complaint may be dismissed because of the absence of direct damage to the complainant. Standing is expressly waived rather than merely unaddressed.
Timing runs the other way. Under §49-7A-21 a complaint must be brought not later than ninety days after discovery of the alleged violation, and in no case more than one year after the date of the violation — except a complaint under §49-7A-12, which must be brought within one year of discovery.
Then the procedural fact that decides most matters. Under §49-7A-22 a panel of three or five board members determines whether probable cause exists. Under §49-7A-23 the panel forwards the complaint with notice requiring the respondent to satisfy or answer in writing within twenty days. And under §49-7A-25 the probable-cause determination is made solely on those submissions — no other evidence may be considered.
A contractor’s written answer is therefore the entire evidentiary record at the stage where the matter is most likely to end. There is no hearing at which to produce the photographs unless someone requests one under §49-7A-27 within twenty days, and failure to request is treated as acceptance. Under §49-7A-26 the penalty considers the damage and threat to public safety, the respondent’s plans and procedures to insure future compliance, any history of previous violations, and other matters as justice requires — so a documented program is an input to the figure rather than mitigation offered afterwards.
The board hearing it is set by §49-7A-3 at eleven members serving without pay, with seats enumerated by constituency — and two of them represent contractors who perform excavation services. Under §49-7A-34 any order carries a presumption of validity, with the burden on the party claiming invalidity.
Penalties, and the multiplier
Under SDCL 49-7A-18 a violation may be assessed at up to $1,000 for the first and up to $5,000 for each subsequent violation occurring within twelve months. Under §49-7A-19 an intentional violation runs to $5,000 and $10,000 on the same twelve-month structure.
The figure that matters most is neither. Under §49-7A-20, each violation constitutes a separate offense, and in the case of a continuing violation each day the violation continues constitutes a separate violation. An uncorrected condition is not one assessment; it is one per day for as long as it stands. That converts a modest ceiling into an open-ended exposure and makes the speed of correction the variable worth managing.
Neither the certificate nor the care of the crew
The contractors who reach us in South Dakota are usually mid-project, holding a certificate a prime has refused and an agent who cannot explain why re-issuing it will not help. What decides money here is not the certificate and not the crew’s care. Because §49-7A-10 imposes strict liability where the locate was adequate while §49-7A-9 requires proof of negligence where it was not, and because §49-7A-25 lets probable cause be decided on the papers alone, the locate photographs and the twenty-day written answer are worth more than any other document in the file. Photograph the marks, and never let the answer go in thin.
Pollution liability sits outside chapter 49-7A. The chapter governs damage to facilities and the complaint process that follows; drilling fluid surfacing into a river, a stock dam or a wetland is an environmental loss the general liability form excludes, and strict liability under §49-7A-10 does not reach it either way. Contractors equipment matters because the eighteen-inch hand-dig trigger converts mechanical progress into manual work at exactly the points where a route is most congested. General liability is specified against the contract — and here the contract statute is the shortest in this series.
The shortest list in this series, and what that leaves open
What §56-3-18 does. SDCL 56-3-18 makes void and unenforceable, as against the policy of the law, a covenant in or collateral to a contract relative to the construction, alteration, repair or maintenance of a building, structure, appurtenance and appliance — including moving, demolition and excavating connected therewith — purporting to indemnify the promisee against liability for damages arising out of bodily injury or property damage caused by or resulting from the sole negligence of the promisee, its agents or employees, or indemnitee. Its source is a single 1973 session law.
The line is sole negligence, so a broad clause survives wherever the contractor is also at fault — the same line Idaho, Maryland and South Carolina draw. And like Idaho’s, this section carries no savings clause for insurance: it does not preserve the validity of an insurance contract, and it does not void a requirement that you procure one. It simply does not address the subject, and we are not going to tell you what follows from that.
What is missing from the list is the part worth noticing. The enumerated work is a building, a structure, an appurtenance and an appliance. That is all of it. There is no highway, which Idaho has; no road, which North Carolina, South Carolina and Rhode Island have; no bridge or water line or sewer line, which Louisiana and Kansas have; and no closing catch-all for other improvements to real property, which Montana has. It is the barest version of this enumeration we have read.
So the boundary question that runs through this family arrives here in its sharpest form, and we have not located a South Dakota decision construing this language as applied to utility, linear or fiber work. A bore in a public right-of-way is not obviously connected with a building or an appliance, and the words the legislature might have used to reach it are the very words absent from the section. We are not going to resolve that for you, because a shorter list is an argument and not a holding, and pricing a subcontract against an argument is how a contractor ends up uninsured for the thing that actually happens. What is settled — the sole-negligence line, and the silence on insurance — is settled regardless.
Strict liability or none at all, decided by the marking rather than by the crew care, is a rule about one excavation. What a South Dakota program carries besides is on our South Dakota fiber contractor insurance page.
Why Fiber Optic Guard Insurance
What we actually do on a South Dakota file: photograph the marks against the clock and against the line as found, because §49-7A-9 and §49-7A-10 make that record the thing that decides whether strict liability or a negligence standard applies; count the forty-eight hours from 12:01 a.m. the day after the call rather than from the call; nominate a realistic start date, since under §49-7A-8 a later start lengthens the operator’s window rather than shortening it; treat the twenty-day written answer under §49-7A-23 as the whole record, because §49-7A-25 says probable cause is decided on nothing else; correct an uncorrected condition immediately, since §49-7A-20 makes every additional day a separate violation; and read the subcontract knowing §56-3-18 stops at sole negligence, says nothing about insurance, and lists less work than any comparable statute in this series. If a prime is asking for an additional-insured endorsement, send it — this statute will not answer that for you.
Learn more
The operating model and its coverage
Other fiber operating models
South Dakota
Primary sources cited on this page
Frequently asked questions about South Dakota directional drilling insurance
Does South Dakota’s damage prevention law cover buried fiber?
It names it. SDCL 49-7A-1(10) defines an underground facility as any item of personal property buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephonic or telegraphic communications, fiber optics, cablevision, electric energy, oil, gas, hazardous liquids, or other substances — including pipes, sewers, conduits, cables, valves, lines, wires, manholes, and attachments. Fiber optics is in the list by name, so no inference is required about either the conduit a crew places or the plant it may strike. What is unusual about this definition is the company it keeps: the exclusions from the chapter’s definition of excavation are almost entirely about depth rather than about method or purpose, and eighteen inches recurs through the statute as the number that decides several different questions.
What counts as excavation in South Dakota, and what is carved out?
SDCL 49-7A-1(4) defines excavation as any operation in which earth, rock, or other material in or below the ground is moved or otherwise displaced by means of tools, equipment, or explosives, and expressly includes grading, trenching, digging, ditching, drilling, augering, tunneling, scraping, and cable or pipe plowing or driving. Drilling, augering and cable plowing are all named. The exclusions are then drawn by depth: tilling of soil and gardening to a depth of twelve inches, and tilling for agricultural purposes to eighteen inches; pot hole repair and grading of an existing public road that does not extend more than eighteen inches below the finished roadway; any hand-tool operation, other than a power tool, that does not extend more than eighteen inches below the groundline within the right-of-way; and road or ditch repair that does not extend more than eighteen inches below the original groundline within the right-of-way. Digging in a cemetery, digging in a planned sanitary landfill, and a bar test survey in response to a suspected gas leak are also outside the definition. None of those exempt a bore, but they explain the shape of the statute: it is drawn around how deep the work goes.
How much notice does South Dakota require before a bore?
Forty-eight hours, measured in a way worth reading twice. Under SDCL 49-7A-5, no excavator may begin any excavation without first notifying the one-call notification center, and notice must be given at least forty-eight hours prior to commencement. The section then defines when that period starts: the forty-eight-hour period begins at 12:01 a.m. the day after notice is submitted to the notification center, excluding any Saturday, Sunday, or legal holiday of the state. So the clock does not start when you call — it starts at one minute past midnight on the next counting day, which means a Friday afternoon call and a Friday morning call produce the same start. The board may promulgate rules reducing the period for emergencies or for subsequent inquiries to an original locate request, and lengthening it for nonexcavation requests. This section was amended by SL 2026, ch 183.
How accurate does a South Dakota locate have to be?
Eighteen inches, and the same figure then binds you. Under SDCL 49-7A-8 an operator receiving notice must advise the excavator of the location of underground facilities by marking with stakes, flags, paint, or other clearly identifiable markings within eighteen inches horizontally from the exterior sides of the facilities. The operator’s response time is the later of the forty-eight-hour period beginning at 12:01 a.m. the day after notice is received, or the period between notice and the excavation start time the excavator provided — so nominating a later start date extends the operator’s window rather than shortening it. Then the reciprocal duty: excavators must maintain a minimum horizontal clearance of eighteen inches between a marked facility and the cutting edge of any mechanical equipment, and where excavation is required within eighteen inches horizontally the excavator must expose the facility with hand tools or noninvasive methods approved by rule, and protect and support it before further mechanical excavation. This section was also amended by SL 2026, ch 183.
If I hit a marked line in South Dakota, how bad is it?
That depends entirely on whether the marking was timely and adequate, and the two outcomes are very far apart. Under SDCL 49-7A-10, if the requested information was provided within the time specified and sufficiently identifies the location of the facilities in accordance with §49-7A-8, any excavator damaging or injuring those facilities is strictly liable for all damage proximately caused. Strictly liable — not liable on proof of fault. Under SDCL 49-7A-9, if location markings are not provided within the time specified, or if the markings provided fail to identify the location of the facilities in accordance with statute and rule, an excavator damaging those facilities is not liable except on proof of negligence. So the quality of the operator’s paint decides which liability regime you are in. Section 49-7A-10 also states that compliance with the chapter does not excuse a person from acting in a careful and prudent manner, and does not affect civil remedies otherwise provided by law except as the chapter specifically provides.
What do I have to do if I damage a facility?
Report it, and do not touch it. Under SDCL 49-7A-12, if any underground facility is damaged, dislocated, or disturbed in advance of or during excavation work, the excavator must immediately notify the one-call notification center and, if known, the operator. No excavator may conceal or attempt to conceal any damage, dislocation, or disturbance, and no excavator may attempt any repair unless authorized by the operator. Where the damage results in the escape of any flammable, toxic, or corrosive gas or liquid, the excavator must immediately report the escape by calling 911 and notify the center and the operator. Note that the duty attaches to a facility that is merely dislocated or disturbed, not only to one that is broken — a bore that shifts a line without breaching it is inside this section. Separately, under SDCL 49-7A-13, an excavator who cannot locate a facility, or who discovers that the operator located it incorrectly, must promptly notify the operator or the center.
Who can file a complaint against me in South Dakota?
Anyone, and the statute forecloses the obvious objection. Under SDCL 49-7A-17, any person with a complaint against a party who violates — or who procures, aids, or abets a violation of — §49-7A-2, §49-7A-5, §49-7A-8 or §49-7A-12, or rules promulgated under them, may apply to the board for relief. The section then adds that no complaint may be dismissed because of the absence of direct damage to the complainant or petitioner. Standing is expressly waived. There are time limits that work in your favor: under §49-7A-21 a complaint must be brought not later than ninety days after discovery of the alleged violation and in no case more than one year after the date of the alleged violation, except that a complaint alleging a violation of §49-7A-12 — the damage-reporting section — must be brought within one year of discovery.
How does the South Dakota penalty process actually run?
On the papers first, and quickly. Under SDCL 49-7A-22 a panel of three or five members of the Statewide One-Call Notification Board is appointed to determine whether there is probable cause to believe a violation occurred. Under §49-7A-23 the panel forwards the complaint to the respondent with notice requiring it to satisfy or answer in writing within twenty days. Then the provision that decides how much care the answer deserves: under §49-7A-25, the determination of probable cause is made by the panel solely on those submissions, and no other evidence may be considered. Your written answer is the entire record at that stage. Under §49-7A-26 the penalty amount considers the damage and threat to public safety, the respondent’s plans and procedures to insure future compliance, any history of previous violations, and other matters as justice requires — so a documented damage prevention program is an input to the number. Under §49-7A-27 the board accepts the panel’s recommendation unless a party requests a hearing within twenty days, and failure to request one is considered acceptance.
How large are the penalties?
Under SDCL 49-7A-18, a person who violates or who procures, aids, or abets a violation of the listed sections may be assessed up to one thousand dollars for the first violation and up to five thousand dollars for each subsequent violation occurring within twelve months of the initial one. Under §49-7A-19, where the violation is intentional, those figures rise to five thousand dollars for the first and ten thousand for each subsequent violation within twelve months. The multiplier that matters more than either figure is in §49-7A-20: each violation of any statute or rule of the board constitutes a separate offense, and in the case of a continuing violation each day the violation continues constitutes a separate violation. A condition left uncorrected is therefore not one penalty but one per day. Under §49-7A-34 any order of the board carries a presumption of validity, and the burden is on the party claiming it invalid to plead and prove the facts establishing invalidity.
What does South Dakota’s anti-indemnity statute do to my subcontract?
It is the shortest statute of its kind we have read, and its brevity is the point. SDCL 56-3-18 voids a covenant collateral to a contract relative to work on four enumerated things — the operative sentence is quoted in full further down this page — where the covenant purports to indemnify the promisee against liability for damage caused by or resulting from its own sole negligence. Two features stand out. The line is sole negligence, so a clause survives wherever the contractor is also at fault. And the enumerated work is the bare list: a building, a structure, an appurtenance and an appliance. There is no highway, no road, no bridge, and no closing catch-all for other improvements to real property — where several neighboring states have some or all of those. The section carries no savings clause for insurance either. What that shorter list means for a bore in a public right-of-way is the question this page does not answer, and the reason is set out below.
Insure your South Dakota bores on the locate, not the story
Send the route, the marking photographs, and the subcontract. In South Dakota the paint decides which rule you are under.