Rhode Island is a small state with old plant, and its excavation chapter reads like it was written by people who knew that. It fixes the tolerance for a mark in the statute rather than in a manual. It tells you that a line someone has abandoned must still be treated as carrying service. And it will not let you close a hole after a strike until somebody from the utility is standing there.

This page works both axes, and each of them ends in a stated limit — one about who owns the fiber, one about whether the contract statute reaches your work. Neither limit requires guessing; both are read straight off the text. Chapter 39-1.2 fixes the eighteen inches and the four clocks; §6-34-1 fixes the clause. The excavation inside those limits is on the Directional Drilling Insurance pillar and the pollution liability page.

Boring in Rhode Island? A line taken permanently out of service still has to be treated as live.

Get a Free Quote

Eighteen inches, fixed by statute

Most states leave the accuracy of a locate to a practice standard. Section 39-1.2-1(3) puts it in the law: the approximate location of underground facilities means a strip of land extending not more than one and one-half feet on either side of the underground facilities.

That single definition does two jobs. It tells a utility how accurate its paint has to be, and it tells a bore crew what the protected strip actually is — because §39-1.2-2 prohibits excavating in the approximate location of public utility facilities without first having ascertained the location of all such facilities in the area, or the absence thereof.

The phrase at the end is doing work. Establishing that nothing is there is a form of compliance under this section, which means a documented negative response is worth as much in the file as a set of marks.

Because the tolerance is statutory, a photograph showing the distance between the mark and the line as found is measured against a fixed number in this state rather than against an argument about industry practice. That is the single most useful thing a crew can record here.

Nothing here is really dead

Old corridors are full of plant nobody uses, and Rhode Island legislated for exactly that. Under §39-1.2-1(1), abandoned utility facilities are any known underground or submerged utility line or facility permanently taken out of service — and the definition continues that, for excavation purposes, abandoned underground utility facilities should always be considered to be active utility service.

A parallel definition in §39-1.2-1(10) covers inactive facilities: those temporarily taken out of service with the expectation of becoming usable in the future. And §39-1.2-1(15) puts the whole category inside the protected class — public utility facilities include active, newly installed, and inactive or abandoned facilities.

The practical consequence runs against a natural instinct. A crew that identifies a line as dead has not found a reason to relax; it has found a facility that the statute says to treat as live. Whatever else the record shows after a strike, it should not show a decision made because a line looked abandoned.

One definition runs the other way, and it is worth knowing for what it excludes. Under §39-1.2-1(5), damage means the substantial weakening of structural or lateral support of a utility line, penetration or destruction of a protective coating or housing, or partial or complete severance — but expressly does not include an intentional penetration or severance by a public utility or its contractors for the purpose of effecting a repair or replacement. Deliberate work by the owner on its own line is not a damage event.

A hundred feet, and four clocks

Under §39-1.2-5(a), anyone responsible for excavating within one hundred feet of a public utility facility — or discharging explosives within a hundred feet of one — must notify the association at least seventy-two hours, excluding Saturdays, Sundays and holidays, and not more than thirty days before commencing. Actual excavation must commence within thirty days.

The utility carries clocks of its own in the same subsection: on receipt of each notice it must mark within seventy-two hours, or, where §39-1.2-12 applies, re-mark within forty-eight hours. The shorter re-marking window is the one that matters on a job of any duration, because markings degrade and §39-1.2-12 exists to refresh them.

The notice itself is prescribed. Under §39-1.2-5(b) an excavator must describe the excavation location by giving the city or town; the street, way, or route number where appropriate; the streets at the nearest intersection; the numbered address of the closest buildings; and any other description that accurately defines the location, including landmarks and utility pole numbers. On a rural or highway run the nearest numbered address can be a considerable distance from the bore, and pole numbers are named in the statute precisely because they are often the only reliable reference.

If the marks come back wrong, §39-1.2-5(c) supplies the route: an excavator who determines that a facility has been mismarked may notify the association and the appropriate public utility. Doing so is discretionary in the statute and close to mandatory in practice, because it is the step that creates a record of the mismark before the bore proceeds.

You cannot close the hole until they get there

Under §39-1.2-11(a), on any contact with or damage to a pipe, cable, protective coating, or any other underground facility of a public utility, the affected utility must be notified immediately by the person responsible for the operation, prior to backfilling. The utility must then immediately dispatch personnel to effect temporary or permanent repair.

Then the sentence that governs the crew’s next several hours: under no circumstances shall the excavator backfill or conceal the damaged area until the public utility arrives.

Read the standard carefully, because it is not the one most states use. The bar does not lift when permission is given over the phone, and it does not lift when the call has been logged. It lifts on arrival. An open excavation held for a utility crew is traffic control, site security and standing equipment for as long as the response takes, and none of that is discretionary. It is worth pricing rather than absorbing.

Which plant the chapter protects, and which it may not

This is the point where an honest page has to slow down. Your duties as an excavator are not in doubt. They attach because you are working within a hundred feet of a public utility facility, and the chapter’s definitions plainly cover the electric, gas, telephone, cable television and water plant that a fiber route runs among.

What is less clear is whether the conduit you place is itself protected plant. Under §39-1.2-1(14) a public utility is the owner or operator of underground facilities furnishing electric, gas, telephone, or water service, and the definition also takes in electric transmission companies, nonregulated power producers, any cable television service, and water companies that voluntarily join the association. Under §39-1.2-1(15) public utility facilities are the underground plant owned and operated by a public utility for furnishing electricity, gas, water, cable television, or telephone service.

Telephone and cable television are named. Telecommunications, as a general category, is not. Neighboring New Hampshire does name it, which is why the same question does not arise there.

So the answer splits, and we would rather split it than round it off. The excavator side is settled. The plant side depends on who owns and operates the fiber — and we have not located a Rhode Island decision resolving it. We are not going to read a word into a definition that the legislature did not use, in either direction. What it changes in practice is narrow but real: on a build for an operator that is not a telephone company or a cable television service, the protection your own newly placed conduit enjoys under this chapter is a question worth asking before you rely on it.

The exposure here is time, not argument

The contractors who reach us in Rhode Island are usually mid-project, holding a certificate a prime has refused and an agent who cannot explain why re-issuing it will not help. The exposure that actually shows up here is time, not argument. Because §39-1.2-11(a) holds an excavation open until the utility physically arrives, and because §39-1.2-1(1) means a line found dead still has to be handled as live, the cost of a Rhode Island strike is measured in standing crews and held traffic control before anyone reaches the question of fault. Price the delay, and photograph the paint against the line.

Pollution liability is outside chapter 39-1.2 entirely. The chapter governs contact with utility plant and what must happen afterwards; drilling fluid reaching a bay, a salt marsh or a storm drain is an environmental loss the general liability form excludes, and in a state this small and this coastal the receiving water is rarely far from the bore. Contractors equipment matters because an open excavation waiting on a utility response is idle plant on a live street. General liability is specified against the contract, and the contract statute here leaves that specification standing.

What §6-34-1 settles, and the one thing it does not

What it settles. R.I. Gen. Laws §6-34-1(a) voids, as against public policy, a covenant in or collateral to a contract relative to the design, planning, construction, alteration, repair, or maintenance of a building, structure, highway, road, appurtenance, and appliance — including moving, demolition, and excavating connected with those items — pursuant to which the promisee has hired the promisor to perform work, purporting to indemnify the promisee or its independent contractors, agents, employees or indemnitees against liability for damages proximately caused by or resulting from the negligence of the promisee or those parties.

Two things in that sentence are easy to read past. The first is what is absent: the word sole. Several states in this region void only a clause shifting the promisee’s sole negligence, which leaves a broad clause fully enforceable the moment the contractor is even minimally at fault. Rhode Island does not draw that line, so a clause shifting a prime’s negligence onto a bore crew runs against the section whether or not the crew also contributed.

The second is the hiring condition — the section is framed around a contract under which the promisee hired the promisor. It is aimed at the ordinary prime-to-subcontractor relationship rather than at every agreement that touches a project, which is worth checking when the counterparty is an owner or a utility rather than the party that engaged you.

And what survives. The proviso to subsection (a) states that the section does not affect the validity of any insurance contract, worker’s compensation agreement, or an agreement issued by an insurer. Subsection (b) adds that nothing in the section prohibits any person from purchasing insurance for his or her own protection or from purchasing a construction bond. So this is a state where the promise is cut back and the insurance requirement beside it is left alone — which is exactly where risk transfer tends to relocate. The clause may be void while the certificate obligation that accompanies it is not.

The one thing it does not settle. Whether that enumerated work reaches a fiber bore. Highway and road are in the list, and much fiber is placed in a road right-of-way — that is the strongest textual argument available. But the section reaches excavating as work connected with one of the listed items rather than as a category standing on its own, and we have not located a Rhode Island decision construing this language as applied to utility, linear or fiber work. We are not going to predict one. Everything in the two paragraphs above holds whichever way that question is eventually answered, which is why it is stated here rather than left as an absence.

The eighteen inches fixed by statute and the four clocks in chapter 39-1.2 are field constraints on a bore. A contractor license, the Rhode Island markets and the other crews are on our Rhode Island fiber contractor insurance page.

Why Fiber Optic Guard Insurance

What we actually do on a Rhode Island file: measure and photograph the paint against the line as found, because §39-1.2-1(3) makes one and a half feet a statutory standard rather than a practice; make sure nobody on the crew has downgraded a line because it looked abandoned, since §39-1.2-1(1) forecloses that judgment; price the response window in §39-1.2-11(a) as standing time, because the backfill bar lifts on the utility’s arrival and not on its permission; put pole numbers in the notice where the nearest address is far off, as §39-1.2-5(b) contemplates; and read the subcontract knowing that §6-34-1 reaches the promisee’s negligence generally but leaves the insurance requirement standing. If a prime has refused your certificate, send the insurance specification along with the indemnity clause — in this state they are governed differently.

Frequently asked questions about Rhode Island directional drilling insurance

How close can a Rhode Island mark be and still be correct?

One and a half feet on either side, and the figure is a defined term rather than a convention. R.I. Gen. Laws §39-1.2-1(3) provides that "approximate location of underground facilities" means a strip of land extending not more than one and one-half feet on either side of the underground facilities. That is a narrower tolerance than several states allow, and it cuts both ways for a boring contractor: it is a tighter standard for the utility that marked the line, and a tighter standard for you when the question is whether your bore stayed clear of the strip. Because the figure is in the statute rather than in a manual, it is also the number a file should be built to measure against — a photograph showing the distance between the paint and the line as found is evidence against a fixed standard here, not against a practice.

Do I have to worry about abandoned lines in Rhode Island?

You have to treat them as live, by instruction. §39-1.2-1(1) defines abandoned utility facilities as any known underground or submerged utility line or facility that has been permanently taken out of service — and then adds that, for excavation purposes, the abandoned underground utility facilities should always be considered to be active utility service. §39-1.2-1(10) separately defines inactive utility facilities as those temporarily taken out of service with the expectation of becoming usable in the future. And §39-1.2-1(15) closes the loop: public utility facilities include active, newly installed, and inactive or abandoned facilities. For a directional drilling contractor working an old New England corridor, where dead plant is common and records are thin, the practical rule is that discovering a line is out of service does not change how it must be handled.

When does the duty to call attach in Rhode Island?

At a hundred feet. Under §39-1.2-5(a), any person, public agency, or public utility responsible for excavating within one hundred feet of a public utility facility, or for discharging explosives within one hundred feet of one, must notify the association of the proposed excavation or discharge at least seventy-two hours, excluding Saturdays, Sundays, and holidays, but not more than thirty days before commencing. Actual excavation must then commence within thirty days. Two more clocks run on the utility side: on receipt of each notice the utility must mark the location of all underground facilities within seventy-two hours, or, where §39-1.2-12 applies, re-mark within forty-eight hours. Section 39-1.2-2 states the underlying prohibition — no person may excavate in the approximate location of public utility facilities without having first ascertained the location of all such facilities in the area, or the absence thereof.

What has to be in a Rhode Island notice?

Five things, and the last one is open-ended in a way that rewards care. Under §39-1.2-5(b) the excavator must provide a description of the excavation location that includes the name of the city or town where the excavation will take place; the name of the street, way, or route number where appropriate; the name of the streets at the nearest intersection; the numbered address of buildings closest to the excavation; and any other description that will accurately define the excavation location, including landmarks and utility pole numbers. Pole numbers are named in the statute, which is worth noticing on a linear route where the nearest numbered address may be a long way from the bore. Section 39-1.2-5(c) then supplies the step for when the marks are wrong: if an excavator determines that a public utility facility has been mismarked, the excavator may notify the association and the appropriate public utility.

What do I do if I hit something in Rhode Island?

Stop, notify, and wait for someone to arrive. Under §39-1.2-11(a), upon any contact with or damage to any pipe, cable, or its protective coating, or any other underground facility of a public utility, the affected public utility must be notified immediately by the person responsible for the operation causing the contact or damage, prior to backfilling the excavation. On receipt of that notice the public utility must immediately dispatch personnel to the location to effect temporary or permanent repair. And then the clause that governs the crew: under no circumstances shall the excavator backfill or conceal the damaged area until the public utility arrives. Note the standard — not until permission is given, and not until a call is logged, but until the utility is physically there. On a route being worked to a schedule that is a real cost, and it is not one a crew can decide to absorb.

Does Rhode Island’s damage prevention chapter cover fiber?

Your duties plainly attach. Whether the fiber you place is itself protected plant is a narrower question, and the statute does not answer it as cleanly as some neighbors do. §39-1.2-1(14) defines a public utility as the owner or operator of underground facilities for furnishing electric, gas, telephone, or water service, and also includes electric transmission companies and nonregulated power producers, any cable television service, and any water company that voluntarily joins the association. §39-1.2-1(15) defines public utility facilities as the underground plant and equipment owned and operated by a public utility for the purpose of furnishing electricity, gas, water, cable television, or telephone service. Telephone and cable television are named; telecommunications, as a general category, is not — and neighboring New Hampshire does name it. So the excavator side is settled, because your obligations are triggered by working within a hundred feet of covered plant, and electric, gas, telephone, cable and water plant is what a fiber route runs among. The open question is the other side: whether conduit placed for a given operator is itself within the chapter depends on who owns and operates it. We have not located a Rhode Island decision resolving that, and we are not going to resolve it for you by reading a word into the definition that the legislature did not use.

What does Rhode Island’s anti-indemnity statute do to my subcontract?

It voids more than a sole-negligence statute would, and it leaves your insurance obligations alone. R.I. Gen. Laws §6-34-1(a) makes against public policy and void a covenant in or collateral to a contract relative to work on the six items the section enumerates — the list is quoted in full further up this page — "… pursuant to which contract or agreement the promisee or the promisee’s independent contractors, agents, or employees has hired the promisor to perform work", purporting to indemnify the promisee or its independent contractors, agents, employees, or indemnitees against liability for damages proximately caused by or resulting from the negligence of the promisee or those parties. Note that the section does not say sole negligence. Several states in this region void only the clause that shifts the promisee’s sole negligence, which leaves a broad clause enforceable as soon as the contractor is even minimally at fault; Rhode Island does not draw that line. Note also the hiring condition — the section is framed around a contract under which the promisee hired the promisor, so it speaks to the ordinary prime-to-subcontractor relationship rather than to every agreement in a project. Two savings provisions follow: the proviso to subsection (a) states that the section does not affect the validity of any insurance contract, worker’s compensation agreement, or an agreement issued by an insurer, and subsection (b) provides that nothing in the section prohibits any person from purchasing insurance for his or her own protection or from purchasing a construction bond.

Does §6-34-1 reach a fiber bore?

That is the part we will not answer for you. The enumerated work is a building, structure, highway, road, appurtenance, and appliance, with excavating connected with those things. Highway and road are in the list, and a great deal of fiber is placed in a road right-of-way, which is the strongest textual argument available. But excavating is reached as work "connected with" one of the enumerated items rather than as a category of its own — compare Montana, where excavation stands on its own alongside "other improvement to real property" — and we have not located a Rhode Island decision construing this scope language as applied to utility, linear, or fiber work. We are not going to tell you how a Rhode Island court would come out on it. What is settled is set out above and does not depend on the answer: where the section applies, it reaches the promisee’s negligence generally, and it leaves your insurance and bond obligations standing.