Directional drilling by state

Directional Drilling Insurance in Minnesota

What Minnesota law actually does to a fiber bore — a definition that looks like it excludes telecommunications work and does not, and an insurance statute under which a certificate waives nothing and a coverage shortfall becomes your personal obligation.

48 States Licensed
24+ Specialty Markets
337.05 A Certificate Waives Nothing
CPCU Led by a CPCU

There is a sentence in Minnesota’s construction statute that appears to remove telecommunications work from its protection, and reading it quickly is the most expensive mistake available in this state. The definition of a building and construction contract carves out contracts involving telephone utility equipment. A fiber contractor who stops there concludes the chapter does not apply. It does apply, and the reason is in the qualifiers around that phrase rather than in the phrase itself.

Getting that right matters because Minnesota then regulates the insurance promise more precisely than any other state on this site: it voids insuring another party for that party’s own negligence, converts a failed insurance promise into indemnity measured by the coverage you promised, and states that a certificate waives nothing. This page works through that and through a damage prevention chapter with exactly two escapes. §337.05 matters because a bore can go wrong. How it goes wrong is set out on the Directional Drilling Insurance pillar and the pollution liability page.

Boring in Minnesota? A gap between the contract specification and the placed program becomes an indemnity obligation. We match them before binding.

Get a Free Quote

The carve-out that looks like it excludes fiber and does not

Minn. Stat. §337.01, subd. 2 defines a building and construction contract as a contract for the design, construction, alteration, improvement, repair or maintenance of real property, highways, roads or bridges. The term then does not include contracts for the maintenance or repair of machinery, equipment or other such devices used as part of a manufacturing, converting or other production process, including electric, gas, steam, and telephone utility equipment used for production, transmission, or distribution purposes.

Both halves have to be read together. The inclusion is broad and covers improvement of real property as well as highways and roads, which is what a bore in a right-of-way is. The exclusion is narrow in two independent ways. It applies only to maintenance or repair, so new construction is never within it regardless of what is being built. And its objects are machinery, equipment or other such devices used in a production process — the enumerated utilities qualify the kind of equipment contemplated, not the kind of construction excluded. Placing new conduit by directional bore is neither maintenance nor repair, and conduit in the ground is not production equipment. The work is inside the chapter.

With scope settled, the rule itself. §337.02 makes an indemnification agreement in or executed in connection with a building and construction contract unenforceable except to the extent the underlying injury or damage is attributable to the negligent or otherwise wrongful act or omission — including breach of a specific contractual duty — of the promisor or the promisor’s independent contractors, agents, employees, or delegatees. A second exception permits an owner, responsible party, or governmental entity to indemnify a contractor with respect to strict liability under environmental laws. This is proportional rather than prohibitory: the obligation survives to the extent of your own fault. The words “breach of a specific contractual duty” deserve attention on a bore, because they tie the size of the indemnity to the scope-of-work language rather than to negligence alone.

§337.03 removes certain arrangements from the chapter, including where an owner permits construction access as an accommodation and certain settlement agreements. §337.04 preserves the validity of any insurance contract, workers’ compensation agreement, construction bond, or other agreement lawfully issued by an insurer or bonding company.

An insurance statute that measures the promise, not the paperwork

§337.05 is where Minnesota separates itself, and it repays close reading because each subdivision does something different.

Insuring another party for that party’s own negligence is void. Subd. 1(a) preserves agreements by which a promisor provides specific insurance for the benefit of others. Subd. 1(b) then makes void and unenforceable a provision requiring a party to provide insurance coverage to one or more other parties, including third parties, for the negligence or intentional acts or omissions of any of those other parties. Subd. 1(c) and (d) preserve a list of arrangements from that rule: workers’ compensation, construction performance or payment bonds, builder’s risk policies, owner or contractor-controlled insurance programs or policies, project-specific insurance for claims arising out of the promisor’s own negligent acts or omissions, and coverage for the promisee’s vicarious liability or liability imposed by warranty arising out of the promisor’s acts. Subd. 1(e) removes the rule entirely for work within 50 feet of public or private railroads, or railroads regulated by the Federal Railroad Administration — a provision a fiber route crossing rail corridors will meet in practice.

A coverage shortfall becomes an indemnity obligation. Subd. 2 provides that where a promisor agrees to provide specific types and limits of insurance, a claim arises within the scope of that specified insurance, and the promisor did not obtain and keep it in force, then as to that claim and regardless of §337.02 the promisee has indemnification from the promisor to the same extent as the specified insurance. The proportional protection of the anti-indemnity rule is expressly switched off for this situation. Subd. 4 applies the same logic to retentions, giving the promisee indemnification to the full extent of a self-insured retention or deductible. Subd. 3 supplies the only escape: the indemnification is unavailable if the specified insurance was not reasonably available in the market and the promisor said so before signing, or signed subject to a written exception.

And the certificate settles nothing. Subd. 5, headed “No waiver by certificates,” provides that a promisor’s obligation to provide specified insurance is not waived by a promisee’s failure to require or insist upon certificates or other evidence of insurance, or by the related documentation failures the subdivision lists. Read with subd. 2, the Minnesota position is exact and uncomfortable: the contract specification is the obligation, any gap between it and the placed program converts into indemnity measured by the specification, and the fact that the prime never checked is not a defense. A certificate here is evidence of an obligation rather than a discharge of one.

What the damage prevention chapter does to a strike claim

Minnesota’s excavation notice system is Minn. Stat. chapter 216D. Every state has a one-call law and the notice mechanics are broadly similar, so the notice period is not the story. What Minnesota does with reimbursement and with conduct is.

Reimbursement is close to strict, with two doors out. Under §216D.06, subd. 2(a), an excavator who damages an underground facility shall reimburse the operator for the cost of necessary repairs and, for a pipeline, the cost of the product being carried that was lost as a direct result of the damage. Subd. 2(b) excuses reimbursement only where the damage was caused by the sole negligence of the operator, or where the operator failed to comply with §216D.04, subd. 3. Sole negligence is a demanding standard and the operator-failure route depends on a specific statutory duty, so the practical work is done in the locate record.

There is criminal exposure attached to conduct after the strike. Under §216D.06, subd. 1(c), an excavator who knowingly damages an underground facility and does not notify the operator as soon as reasonably possible, or who backfills in the immediate area before the operator has investigated, is guilty of a misdemeanor. Subd. 1(b) requires the excavator to delay backfilling until the operator has investigated unless the operator authorizes otherwise, and requires repairs to be performed by the operator or by qualified personnel it authorizes. The hours after a strike are governed conduct in Minnesota, not merely good practice.

Civil penalties accrue by the day. Under §216D.08, subd. 1, a person engaged in excavation for remuneration, or an operator, who violates §§216D.01 to 216D.07 is subject to a civil penalty imposed by the commissioner not to exceed $1,000 for each violation per day of violation. The district court may hear and determine actions under the section, and trials must be to the court sitting without a jury. Subd. 2 permits the commissioner to negotiate a compromise settlement, considering the appropriateness of the penalty to the size of the business charged, the gravity of the violation, and the good faith of the person charged in attempting to achieve compliance. A per-day structure rewards prompt correction in a way a flat penalty does not.

Measured against the specification, not described by it

The contractors who reach us in Minnesota are usually mid-project, holding a certificate a prime has refused and an agent who cannot explain why re-issuing it will not help. Here the document was never the operative thing. Because §337.05, subd. 5 provides that the obligation to provide specified insurance is not waived by a promisee’s failure to require or insist on evidence of it, and because subd. 2 converts any shortfall into indemnity measured by what was promised, the question is never whether the certificate looks right — it is whether the placed program matches the specification in the subcontract. An agent reissuing paperwork is answering a question Minnesota does not ask.

Put the axes together and Minnesota rewards exactness in one document and speed in one procedure. The program is measured against a document rather than described by one.

Pollution liability answers a loss chapter 216D never contemplates. That chapter obliges you to reimburse the operator for a damaged facility and its lost product, but drilling fluid surfacing into a wetland is a third-party environmental claim the general liability form excludes. General liability has to be specified against the subcontract’s insurance requirement term by term, because subd. 2 measures the exposure by that requirement rather than by the policy. And contractors equipment matters because §216D.06 obliges the operator to control the repair, so your own downtime and tooling losses sit outside the reimbursement the statute creates.

On a Minnesota file it reduces to three reconciliations. We reconcile the placed program against the contract specification line by line, including retentions, because subd. 4 reaches deductibles directly. We check whether any part of the route runs within 50 feet of a railroad, because subd. 1(e) suspends the insuring rule there. And we ask whether any part of the route runs within 50 feet of a railroad, because §337.05, subd. 1(e) suspends the insuring rule entirely on that ground.

One Minnesota detail worth carrying into contract review. Licensing here runs through the Minnesota Department of Labor and Industry — Board of Electricity, but the license is not what sets your insurance obligation — the subcontract is, and §337.05 gives that document unusual legal force. Where most states let a certificate close the loop, Minnesota keeps the loop open until the coverage actually matches what was promised.

§337.05 measures an insurance promise and chapter 216D allows exactly two escapes, both read against a boring subcontract. Licensing, the Minnesota markets and the crews that are not boring are on our Minnesota fiber contractor insurance page.

Why Fiber Optic Guard Insurance

What we actually do on a Minnesota file: reconcile the placed program against the contract insurance specification before binding, because §337.05, subd. 2 converts any daylight between them into an indemnity obligation; confirm whether a written exception is needed for anything not reasonably available, since that is the only escape subd. 3 allows; and set the pollution line to an exposure neither chapter addresses. If your subcontract already specifies types and limits, send that document first — in Minnesota it is the measure of the obligation.

Frequently asked questions about Minnesota directional drilling insurance

Minnesota’s statute excludes telephone utility work. Does that mean my fiber bore is outside it?

No, and this is the most consequential misreading available in Minnesota. Minn. Stat. §337.01, subd. 2 defines a building and construction contract as a contract for the design, construction, alteration, improvement, repair or maintenance of real property, highways, roads or bridges. It then says the term does not include contracts for the maintenance or repair of machinery, equipment or other such devices used as part of a manufacturing, converting or other production process, including electric, gas, steam, and telephone utility equipment used for production, transmission, or distribution purposes. Read the qualifiers rather than the noun. The exclusion reaches only maintenance or repair, never new construction, and only machinery, equipment or devices, not buried linear plant. A directional bore installing new conduit is construction of an improvement to real property and sits squarely inside the definition.

What does Minnesota’s anti-indemnity rule actually do?

It is drafted as a proportional rule rather than an outright prohibition. Under Minn. Stat. §337.02, an indemnification agreement contained in or executed in connection with a building and construction contract is unenforceable except to the extent that the underlying injury or damage is attributable to the negligent or otherwise wrongful act or omission — including breach of a specific contractual duty — of the promisor or the promisor’s independent contractors, agents, employees, or delegatees. There is a second exception where an owner, responsible party, or governmental entity agrees to indemnify a contractor with respect to strict liability under environmental laws. Note the phrase “breach of a specific contractual duty.” Your indemnity obligation in Minnesota tracks your own fault and your own contract performance, so the scope-of-work language in the subcontract has direct consequences for the size of the obligation.

Can a Minnesota prime require me to insure it for its own negligence?

No, and Minnesota says so in the insurance statute rather than leaving it to the indemnity rule. Under §337.05, subd. 1(a), agreements by which a promisor agrees to provide specific insurance coverage for the benefit of others are generally valid. But subd. 1(b) provides that a provision requiring a party to provide insurance coverage to one or more other parties, including third parties, for the negligence or intentional acts or omissions of any of those other parties is against public policy and is void and unenforceable. Several exceptions are preserved by subd. 1(c) and (d): workers’ compensation, construction performance or payment bonds, builder’s risk policies, owner or contractor-controlled insurance programs, project-specific insurance for claims arising out of the promisor’s own negligence, and coverage for the promisee’s vicarious liability or liability imposed by warranty arising out of the promisor’s acts.

What happens in Minnesota if I do not actually carry the insurance I promised?

The obligation does not simply lapse — it converts. Under §337.05, subd. 2, if a promisor agrees to provide specific types and limits of insurance, a claim arises within the scope of that specified insurance, and the promisor did not obtain and keep the insurance in force, then as to that claim and regardless of §337.02 the promisee has indemnification from the promisor to the same extent as the specified insurance. In other words a coverage gap becomes a personal indemnity obligation measured by the coverage you said you would carry, and the proportional protection of §337.02 does not apply to it. Subd. 4 does the same for retentions: where the insurance includes a self-insured retention or deductible, the promisee has indemnification to the full extent of that amount. Subd. 3 provides the one escape — the indemnification is not available if the specified insurance was not reasonably available in the market and the promisor said so before signing or signed subject to a written exception.

My Minnesota prime accepted my certificate. Is the insurance question closed?

No. Minn. Stat. §337.05, subd. 5 is titled “No waiver by certificates” and provides that a promisor’s obligation to provide specified insurance is not waived by a promisee’s failure to require or insist upon certificates or other evidence of insurance, or by related documentation failures. This is the certificate fight resolved by statute, and it resolves in an uncomfortable direction for the contractor. A prime that never asked for evidence, or accepted a certificate that did not match the specification, has waived nothing. Combined with subd. 2, the exposure is specific: the contract term governs, a shortfall against it becomes indemnity to the same extent, and the fact that nobody noticed at the time is not a defense. In Minnesota the certificate is evidence of the obligation, not a discharge of it.

Who pays for the repair when a Minnesota bore damages a line?

The excavator, subject to two narrow escapes. Under Minn. Stat. §216D.06, subd. 2(a), an excavator who damages an underground facility shall reimburse the operator for the cost of necessary repairs and, for a pipeline, the cost of the product being carried that was lost as a direct result. Subd. 2(b) provides that reimbursement is not required if the damage was caused by the sole negligence of the operator, or the operator failed to comply with §216D.04, subd. 3. Those are the only two doors. There is also criminal exposure that most contractors do not expect: under subd. 1(c), an excavator who knowingly damages an underground facility and does not notify the operator as soon as reasonably possible, or who backfills before the operator has investigated, is guilty of a misdemeanor. Separately, §216D.08, subd. 1 provides a civil penalty imposed by the commissioner not to exceed $1,000 for each violation per day of violation, with trials under the section to the court sitting without a jury.

Insure your Minnesota bores against the specification, not the certificate

Send the subcontract’s insurance requirement and the bore profile. In Minnesota the gap between what was promised and what was placed is the exposure.

Get a Free Quote