Directional Drilling Insurance in Kentucky
What Kentucky law actually does to a fiber bore — a damage prevention Act that defines fiber-to-the-premises, asks you to declare it on the ticket, and gives that request its own response deadline.
Most damage prevention statutes reach fiber work by covering communications generally and leaving the rest to practice. Kentucky went further: its Act defines fiber-to-the-premises, requires the locate request to say whether that is what you are doing, and then gives that request its own operator response deadline.
The consequence is that a Kentucky ticket is a classification decision, not just a notification — and the classification determines how long the operator has before your crew can lawfully proceed. What follows is that regime and the contract statute beside it, which voids a broad indemnity clause outright. The ticket decides the tier and the tier decides the wait. What happens once the crew may lawfully proceed is covered on the Directional Drilling Insurance pillar and the pollution liability page.
Boring in Kentucky? The box you tick on the ticket sets the operator’s deadline.
Get a Free QuoteThe Act knows what you do for a living
Under KRS 367.4903(28), “fiber-to-the-premises” means a service that provides network connectivity between a location and a subscriber using fiber. Subsection (29) adds a definition of a communications network as the platform used to exchange information and data between two or more connected devices.
Definitions in a dig statute are usually there to decide what counts as a protected facility. These two are doing something else — they exist so that other sections can distinguish this kind of excavation from every other kind.
Under KRS 367.4911(3)(b), the information an excavator must give the notification center includes the approximate location and type of work being performed, including if the request involves a fiber-to-the-premises broadband deployment excavation. And under KRS 367.4909, an operator must respond to such a request, in locations not already served by fiber-to-the-premises, within four working days.
So the work has a statutory name, a field on the ticket, and a clock of its own. That is worth knowing precisely, because getting the classification wrong does not simply mislabel the job — it puts the operator on a different deadline from the one your schedule assumes.
The plant is reached the ordinary way. KRS 367.4903(1) defines an underground facility as a line or system used for producing, storing, conveying, transmitting, or distributing telecommunications, electricity, gas, petroleum, petroleum products, cable television, hazardous liquids, water, steam, or sewerage including storm drainage. The same section defines damage to include weakening of structural or lateral support, penetration of a coating or housing, partial or complete dislocation or severance — and rendering a facility permanently inaccessible by the placement of a permanent structure having one or more stories.
Six response tiers, and yours depends on the ticket
KRS 367.4909 does not give operators one deadline. It gives them a schedule, and which line applies is set by what the excavator declared.
Two working days for a normal excavation locate request, or any time before the scheduled start date if agreed under KRS 367.4917(7). Ten working days for a design information request. For a large project, the operator has two working days to tell you it has classified the area that way, and then five working days to respond. For an unmapped or untonable facility, again two working days to notify, then five working days for a normal locate or eight for a large project request. And four working days for a fiber-to-the-premises broadband deployment excavation request in locations not already served.
Read the structure rather than the numbers. Two of those tiers begin with the operator reclassifying your request — large project, or unmapped and untonable — and each reclassification costs days your program did not allow for. A crew that has planned to a two-day response and is told on day two that the area is a large project is now waiting five, and the notice of that is itself the operator meeting its obligation.
The color code sits in the same section: fiber optic and critical telecommunication facilities are marked safety alert orange; reclaimed water, slurry and irrigation are purple. On a route where the crew is reading someone else’s paint, an orange mark is the one most likely to be the same class of plant it is there to place.
Two days, ten days, twenty-one days
Under KRS 367.4911(1)(a) an excavator must notify each affected operator’s designated protection notification center not less than two full working days nor more than ten full working days before commencing, unless a future start date is agreed under KRS 367.4917(7).
And there is an early release. Under 367.4911(1)(b), the two full working days “have elapsed if all affected operators have notified the person.” A crew that has heard back from everyone on its ticket is not required to sit out the remainder of the clock — which is a genuine scheduling asset on a route where one or two operators respond quickly, and which very few states provide.
The ticket then lasts unusually long. Under 367.4911(2), locate requests are valid for twenty-one calendar days from the day of the initial request. Calendar days, not working days — so the count runs through weekends, but three weeks is generous by national standards and reduces the re-ticketing burden on a slow build.
And a single request has a size limit. Under 367.4911(3)(e) the site location or locations must each not exceed five thousand feet in length, unless the excavator and operator agree a larger area. That figure is the planning unit for a linear route here, and the agreement it contemplates is worth reaching in advance rather than discovering mid-build.
Two hundred and fifty dollars, and who actually pays it
Under KRS 367.4917(1), an excavator who fails to comply with KRS 367.4911 — or an operator who fails to comply with KRS 367.4909 — may be subject to a civil penalty of $250 for the first violation, no more than $1,000 for the second, and no more than $3,000 for the third and any subsequent violation.
Two features of that subsection matter more than the figures. The record resets on a rolling year: a violation counts as a first violation again if more than 365 days have elapsed since the last incident attributable to that person. And the employer pays: if a person commits a violation in the course and scope of employment, the penalties shall be imposed on the employer. The assessment follows the company, not the individual holding the controls, which is precisely why it belongs in an underwriting conversation.
Two further penalties sit alongside. Under 367.4917(3), knowingly providing false notice of an emergency to a utility notification center carries $1,000 for each violation. Under 367.4917(4), a violation involving damage to a facility containing flammable, toxic, corrosive or hazardous material — or resulting in its release — carries an additional penalty of up to $1,000, expressly in addition to the penalty under subsection (1) and expressly not in conflict with civil damages for personal injury or property damage. The penalty track and the damage claim run separately.
And the citing agency keeps the money. Under 367.4917(5)(a) civil penalties are paid to the general fund of the state, county, city, or fire protection agency which issued the citation, with the court apportioning where more than one agency was involved. A fire protection agency issuing a citation under a dig statute is not an arrangement most states contemplate, and it widens the set of people on a job site who can begin a matter.
A clerical decision made days before the bore
The contractors who reach us in Kentucky are usually mid-project, holding a certificate a prime has refused and an agent who cannot explain why re-issuing it will not help. What actually moves a Kentucky file is a clerical decision made days earlier. Because KRS 367.4911(3)(b) makes the fiber-to-the-premises declaration part of the request and KRS 367.4909 attaches a different operator deadline to it, a misclassified ticket puts the crew on a schedule the statute never promised — and because KRS 367.4917(1) imposes the penalty on the employer, the consequence lands on the company rather than the person who filed it. Check how your tickets are being classified before you check anything else.
Pollution liability is outside the Act. It governs damage to facilities and the penalties that follow; drilling fluid surfacing into a creek, a karst opening or a storm drain is an environmental loss the general liability form excludes, and in a state with this much limestone the subsurface does not always behave as the bore plan assumes. Contractors equipment matters because a reclassification to large project or to an unmapped facility adds days with the rig standing. General liability is specified against the contract, and the contract statute here is unusually direct about what it will not allow.
A statute that voids the clause, and reverses the words
What it covers. KRS 371.180(1)(a) defines a construction services contract as a contract relating to the construction, alteration, repair, addition to, subtraction from, improvement to, or maintenance of any building, highway, road, railroad, excavation, or other structure, project, development, or improvement attached to real estate, including moving and demolition connected therewith — and separately any contract for planning, design, administration, study, evaluation, consulting or other professional and technical support services in connection with that work.
Notice that excavation stands as its own category rather than as something connected with a building, and that the list closes with a catch-all for any improvement attached to real estate. The scope question that occupies several other states does not arise here.
And now the part that is read wrongly more often than any other provision on this site. Under 371.180(1)(b) and (c), “contractor” means the person offering a contract for services and “contractee” means the person providing services under a contract. That is the reverse of ordinary trade usage, where the contractor is the one doing the work.
With the definitions in hand, 371.180(2) reads clearly: any provision in a construction services contract purporting to indemnify or hold harmless a contractor from that contractor’s own negligence, or from the negligence of its agents or employees, is void and wholly unenforceable. In plain terms — a clause making the party doing the work answer for the negligence of the party that hired it does not stand in Kentucky. There is no sole-negligence qualifier and no partial-fault carve-out.
What survives. Subsection (3) provides that the section does not apply to construction bonds or affect the validity of insurance contracts. So the promise is cut back while the insurance requirement beside it is left standing, which is where risk transfer tends to relocate — the void clause and the surviving certificate obligation should be read together rather than separately. Subsection (4) limits the section to agreements entered into on or after June 20, 2005, so the date on a long-running master agreement is worth checking.
The ticket classification that decides how long an operator has before your crew may proceed is a drilling question. The license, the state markets and the crews that are not on the drill are covered at our Kentucky fiber contractor insurance page.
Why Fiber Optic Guard Insurance
What we actually do on a Kentucky file: check how tickets are being classified, because KRS 367.4911(3)(b) makes the fiber-to-the-premises declaration part of the request and KRS 367.4909 attaches a four-working-day operator deadline to it; watch for a reclassification to large project or to an unmapped or untonable facility, since each adds days the schedule did not carry; use the early-release provision in 367.4911(1)(b) where every operator has already responded, rather than waiting out a clock that has legally elapsed; break a linear route against the five-thousand-foot limit in 367.4911(3)(e) and reach any larger-area agreement in advance; and read the subcontract knowing 371.180(2) voids a broad indemnity outright while 371.180(3) leaves the insurance requirement untouched. If a prime has refused your certificate, send the insurance exhibit as well as the indemnity article — here the statute treats them differently.
Learn more
The operating model and its coverage
Other fiber operating models
Kentucky
Primary sources cited on this page
Frequently asked questions about Kentucky directional drilling insurance
Does Kentucky’s damage prevention law say anything about fiber specifically?
More than any other state statute examined for this site. KRS 367.4903(28) defines fiber-to-the-premises as a service that provides network connectivity between a location and a subscriber using fiber, and 367.4903(29) separately defines a communications network as the platform used to exchange information and data between two or more connected devices. Those definitions then do work elsewhere in the Act. Under KRS 367.4911(3)(b), the information an excavator gives the notification center must include the approximate location and type of work being performed, including whether the request involves a fiber-to-the-premises broadband deployment excavation. And under KRS 367.4909, an operator must respond to a fiber-to-the-premises broadband deployment excavation request, in locations not already served by fiber-to-the-premises, within four working days. The work this page is about has its own defined term, its own field on the ticket, and its own response clock.
Does the Act cover the plant I might strike?
Yes. KRS 367.4903(1) defines an underground facility as an underground line or system used for producing, storing, conveying, transmitting, or distributing telecommunications, electricity, gas, petroleum, petroleum products, cable television, hazardous liquids, water, steam, or sewerage, including storm drainage. Telecommunications and cable television are both named. The same section defines damage broadly — the weakening of structural or lateral support, penetration of a facility coating, housing or other protective device, partial or complete dislocation or severance, and, unusually, rendering any underground facility permanently inaccessible by the placement of a permanent structure having one or more stories. That last limb is worth noting on a build that includes structures as well as bores.
How much notice does Kentucky require, and how long is a ticket good for?
Under KRS 367.4911(1)(a), an excavator must notify each affected operator’s designated protection notification center not less than two full working days nor more than ten full working days before commencing work, unless a future start date is agreed under KRS 367.4917(7). There is an early-release provision most states do not have: under 367.4911(1)(b), the two full working days are treated as elapsed if all affected operators have notified the person. So a crew that has heard back from everyone does not have to wait out the remainder of the clock. Under 367.4911(2), locate requests are valid for twenty-one calendar days from the day of the initial request — a longer life than most states allow, and measured in calendar days rather than working ones.
What has to go in a Kentucky locate request?
Five things under KRS 367.4911(3), and one of them is specific to this trade. The request must give the name and phone number of the excavator or person requesting the locate; the approximate location and type of work being performed, including if the request involves a fiber-to-the-premises broadband deployment excavation; the name and phone number of the work site contact; the estimated start date and start time; and the excavation or demolition site location or locations, each of which shall not exceed five thousand feet in length unless the excavator and operator agree to a larger area. The five-thousand-foot ceiling is the practical unit of planning on a linear route, and the fiber-to-the-premises declaration is the field that determines which response deadline the operator is working to.
How fast does an operator have to respond?
It depends on what kind of request you filed, and Kentucky grades it more finely than most. Under KRS 367.4909 an operator must respond to a normal excavation locate request within two working days after receiving notification, or any time prior to the scheduled start date if agreed under KRS 367.4917(7). A design information request gets ten working days. For a large project the operator must notify the excavator within two working days that the area has been determined to be a large project, and then respond within five working days. For an unmapped or untonable facility request the operator notifies within two working days and then responds within five working days for a normal locate or eight working days for a large project request. And a fiber-to-the-premises broadband deployment excavation request, in locations not already served by fiber-to-the-premises, gets four working days. Six tiers, and the one that applies to you is set by what you declared on the ticket.
What color marks a fiber line in Kentucky?
Safety alert orange. KRS 367.4909 sets out the color coding for temporary underground facility markers, and fiber optic and critical telecommunication facilities are marked safety alert orange — the same color used for communication and alarm or signal lines generally. Reclaimed water, slurry and irrigation facilities are purple. Knowing the code matters on a route where the crew is reading someone else’s paint rather than its own: an orange mark on a Kentucky job is telling you that what is under it is very likely the same kind of plant you are there to install, and that a strike will take out service rather than merely a pipe.
What are the penalties, and who pays them?
Under KRS 367.4917(1), an excavator who fails to comply with any provision of KRS 367.4911, or an operator who fails to comply with any provision of KRS 367.4909, may be subject to a civil penalty of two hundred fifty dollars for the first violation, no more than one thousand dollars for the second, and no more than three thousand dollars for the third and any subsequent violation. Two features matter more than the amounts. A violation counts as a first violation again if more than three hundred sixty-five days have elapsed since the last incident attributable to that person — so the record resets on a rolling year rather than accumulating indefinitely. And if a person commits a violation in the course and scope of employment, the penalties shall be imposed on the employer. The company carries the assessment, not the operator of the machine. Under 367.4917(3), knowingly providing false notice of an emergency carries a civil penalty of one thousand dollars for each violation, and under 367.4917(4) a violation involving damage to a facility containing flammable, toxic, corrosive or hazardous material, or resulting in its release, carries an additional penalty of up to one thousand dollars — expressly in addition to the penalty in subsection (1), and expressly not in conflict with civil damages for personal injury or property damage.
Who collects a Kentucky penalty?
Whoever issued the citation, which is an unusual arrangement and tells you something about how enforcement works here. Under KRS 367.4917(5)(a), except as otherwise provided, all civil penalties recovered for a violation shall be paid to the general fund of the state, county, city, or fire protection agency which issued the citation. Where more than one government agency was involved, 367.4917(5)(b) directs the court to apportion the penalties. A fire protection agency issuing a citation under a dig statute is not something most states contemplate, and it broadens considerably the set of people on a job site who can start a matter against a crew.
What does Kentucky’s anti-indemnity statute do to my subcontract?
It voids a broad indemnity clause outright, and the terminology is inverted in a way that repays careful reading. KRS 371.180(1)(a) defines a construction services contract by an enumeration quoted in full further down this page — it runs from a building through highway, road and railroad to excavation, and closes with a catch-all for any other improvement attached to real estate — and separately covers planning, design and technical support services in connection with that work. Excavation stands as its own category rather than as work connected with a building, so scope is not the open question here that it is in several other states. Then 371.180(1)(b) and (c) define contractor as the person offering a contract for services and contractee as the person providing services under it — the reverse of ordinary usage. With that in mind, 371.180(2) provides that any provision in a construction services contract purporting to indemnify or hold harmless a contractor from that contractor’s own negligence, or from the negligence of his or her agents or employees, is void and wholly unenforceable. Read together: a clause making the party doing the work cover the party that hired it, for that party’s own negligence, does not stand. Subsection (3) provides that the section does not apply to construction bonds or affect the validity of insurance contracts, and subsection (4) that it does not affect agreements entered into before June 20, 2005.